DOB / LPC new survey requirements
We’re doing through permitting and are wondering if we’ll need a new survey. Our last was done in 2018 – nothing has changed and we don’t intend to change anything that is survey related. Does anyone have recent experience or know anything about this?

arewedoneyet
in General Discussion 2 years and 2 months ago
1
Please log in, in order to post replies!

jimhillra | 2 years and 2 months ago
string(1) "1" object(WP_User)#4896 (8) { ["data"]=> object(stdClass)#4916 (12) { ["ID"]=> string(6) "180609" ["user_login"]=> string(9) "jimhillra" ["user_pass"]=> string(63) "$wp$2y$10$QRWZTbPjDPrlhsfWuWTHKeCqy5fBaiZJQCbDzaRLhdOw/y0.5HfD6" ["user_nicename"]=> string(9) "jimhillra" ["user_email"]=> string(25) "info@urban-pioneering.com" ["user_url"]=> string(0) "" ["user_registered"]=> string(19) "2017-08-10 14:06:33" ["user_activation_key"]=> string(0) "" ["user_status"]=> string(1) "0" ["display_name"]=> string(21) "Jim Hill, RA, LEED AP" ["spam"]=> string(1) "0" ["deleted"]=> string(1) "0" } ["ID"]=> int(180609) ["caps"]=> array(1) { ["bbp_participant"]=> bool(true) } ["cap_key"]=> string(15) "wp_capabilities" ["roles"]=> array(1) { [0]=> string(15) "bbp_participant" } ["allcaps"]=> array(1) { ["bbp_participant"]=> bool(true) } ["filter"]=> NULL ["site_id":"WP_User":private]=> int(1) }
Assuming you mean a land survey, you only need one if you are changing the bulk of the house or adding a deck. If you’re not doing either of those things, then you probably don’t need one. If you do need a survey, then it has to have been performed within a year of filing with DOB.