DOB / LPC new survey requirements
We’re doing through permitting and are wondering if we’ll need a new survey. Our last was done in 2018 – nothing has changed and we don’t intend to change anything that is survey related. Does anyone have recent experience or know anything about this?
arewedoneyet
in General Discussion 2 years and 4 months ago
1
Please log in, in order to post replies!
jimhillra | 2 years and 4 months ago
string(1) "1"
object(WP_User)#4959 (8) {
["data"]=>
object(stdClass)#4977 (12) {
["ID"]=>
string(6) "180609"
["user_login"]=>
string(9) "jimhillra"
["user_pass"]=>
string(63) "$wp$2y$10$QRWZTbPjDPrlhsfWuWTHKeCqy5fBaiZJQCbDzaRLhdOw/y0.5HfD6"
["user_nicename"]=>
string(9) "jimhillra"
["user_email"]=>
string(25) "info@urban-pioneering.com"
["user_url"]=>
string(0) ""
["user_registered"]=>
string(19) "2017-08-10 14:06:33"
["user_activation_key"]=>
string(0) ""
["user_status"]=>
string(1) "0"
["display_name"]=>
string(21) "Jim Hill, RA, LEED AP"
["spam"]=>
string(1) "0"
["deleted"]=>
string(1) "0"
}
["ID"]=>
int(180609)
["caps"]=>
array(1) {
["bbp_participant"]=>
bool(true)
}
["cap_key"]=>
string(15) "wp_capabilities"
["roles"]=>
array(1) {
[0]=>
string(15) "bbp_participant"
}
["allcaps"]=>
array(1) {
["bbp_participant"]=>
bool(true)
}
["filter"]=>
NULL
["site_id":"WP_User":private]=>
int(1)
}
Assuming you mean a land survey, you only need one if you are changing the bulk of the house or adding a deck. If you’re not doing either of those things, then you probably don’t need one. If you do need a survey, then it has to have been performed within a year of filing with DOB.