'Clear path' on roof: steel fabricator recommendations?
In closing out old open permits on my 2-story+basement brownstone, the final DOB inspection resulted in a fire code violation for lack of a clear path from front to back.
adam
in General Discussion 5 years and 11 months ago
2
Please log in, in order to post replies!
agdipierro
in General Discussion 5 years and 11 months ago
string(1) "2"
object(WP_User)#5016 (8) {
["data"]=>
object(stdClass)#5019 (12) {
["ID"]=>
string(6) "193981"
["user_login"]=>
string(10) "agdipierro"
["user_pass"]=>
string(34) "$P$BjDTuwCj4tgSBxiRfyvL5BfmyXSBWO."
["user_nicename"]=>
string(10) "agdipierro"
["user_email"]=>
string(25) "alyssagdipierro@gmail.com"
["user_url"]=>
string(0) ""
["user_registered"]=>
string(19) "2024-02-23 12:51:26"
["user_activation_key"]=>
string(0) ""
["user_status"]=>
string(1) "0"
["display_name"]=>
string(31) "Alyssa diPierro Alyssa diPierro"
["spam"]=>
string(1) "0"
["deleted"]=>
string(1) "0"
}
["ID"]=>
int(193981)
["caps"]=>
array(1) {
["subscriber"]=>
bool(true)
}
["cap_key"]=>
string(15) "wp_capabilities"
["roles"]=>
array(1) {
[0]=>
string(10) "subscriber"
}
["allcaps"]=>
array(3) {
["read"]=>
bool(true)
["level_0"]=>
bool(true)
["subscriber"]=>
bool(true)
}
["filter"]=>
NULL
["site_id":"WP_User":private]=>
int(1)
}
As an architect, I’ve designed these kinds of stairs. Your work will need to be filed at the building department, fabricated and installed, and then inspected.
adam | 5 years and 11 months ago
string(1) "1"
object(WP_User)#5007 (8) {
["data"]=>
object(stdClass)#4997 (12) {
["ID"]=>
string(5) "26811"
["user_login"]=>
string(4) "adam"
["user_pass"]=>
string(0) ""
["user_nicename"]=>
string(4) "adam"
["user_email"]=>
string(20) "usamoro2@hotmail.com"
["user_url"]=>
string(0) ""
["user_registered"]=>
string(19) "2009-03-09 02:48:00"
["user_activation_key"]=>
string(0) ""
["user_status"]=>
string(1) "0"
["display_name"]=>
string(4) "adam"
["spam"]=>
string(1) "0"
["deleted"]=>
string(1) "0"
}
["ID"]=>
int(26811)
["caps"]=>
array(0) {
}
["cap_key"]=>
string(15) "wp_capabilities"
["roles"]=>
array(0) {
}
["allcaps"]=>
array(0) {
}
["filter"]=>
NULL
["site_id":"WP_User":private]=>
int(1)
}
Sorry, that posted before I was done… My clear path is blocked by dunnage supporting HVAC equipment. All of it dates from before the clear path was required, but that doesn’t matter now — we have to clear the violation by building a steel bridge (3 steps up, platform, then 3 steps down) over the I-beams. Has anyone on the board done a project like this, and do you have a fabricator/contractor to recommend? Thanks.