Removing Electric and Gas Meters/ C of O change

I’m nearing the end of a renovation that is changing my house from a 3 family to a 1 family. As a 3-family, the building had 3 gas meters (National Grid) and 4 electric meters (Con Ed).
Does anyone know the process for having Con Ed/National Grid pick up the now unneeded meters and close the accounts? (The meters are now unhooked and sitting in the basement and the accounts are still open.) Do I wait until we pass our final inspection with the DOB or can I do this now? We’ve passed our plumbing rough-in.

fawn

in Brownstoner Renovation 12 years and 1 month ago

2

Please log in, in order to post replies!

2 replies

bklynpwds | 12 years and 1 month ago

string(1) "1"
object(WP_User)#4915 (8) {
  ["data"]=>
  object(stdClass)#4892 (12) {
    ["ID"]=>
    string(6) "177016"
    ["user_login"]=>
    string(9) "bklynpwds"
    ["user_pass"]=>
    string(34) "$P$BaLflv1/pnijSTmW34TD1EixxbEY5O0"
    ["user_nicename"]=>
    string(9) "bklynpwds"
    ["user_email"]=>
    string(17) "camrute@yahoo.com"
    ["user_url"]=>
    string(31) "http:///forums/users/bklynpwds/"
    ["user_registered"]=>
    string(19) "2017-08-10 14:25:55"
    ["user_activation_key"]=>
    string(0) ""
    ["user_status"]=>
    string(1) "0"
    ["display_name"]=>
    string(9) "bklynpwds"
    ["spam"]=>
    string(1) "0"
    ["deleted"]=>
    string(1) "0"
  }
  ["ID"]=>
  int(177016)
  ["caps"]=>
  array(2) {
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["cap_key"]=>
  string(15) "wp_capabilities"
  ["roles"]=>
  array(2) {
    [0]=>
    string(10) "subscriber"
    [1]=>
    string(15) "bbp_participant"
  }
  ["allcaps"]=>
  array(4) {
    ["read"]=>
    bool(true)
    ["level_0"]=>
    bool(true)
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["filter"]=>
  NULL
  ["site_id":"WP_User":private]=>
  int(1)
}

We waited until the the plumbing and electric were signed off on, then just called up both companies to pick up their meters.  It was a very simple process and both companies came out quickly and picked up their meters.

anotherposter | 12 years and 1 month ago

string(1) "1"
object(WP_User)#4914 (8) {
  ["data"]=>
  object(stdClass)#4913 (12) {
    ["ID"]=>
    string(5) "53767"
    ["user_login"]=>
    string(13) "anotherposter"
    ["user_pass"]=>
    string(34) "$P$Bq7XUGtTb.5jsWjD4iMAO7rQGswiJX0"
    ["user_nicename"]=>
    string(13) "anotherposter"
    ["user_email"]=>
    string(24) "mail.anon.user@gmail.com"
    ["user_url"]=>
    string(28) "/forums/users/anotherposter/"
    ["user_registered"]=>
    string(19) "2017-08-10 13:38:06"
    ["user_activation_key"]=>
    string(0) ""
    ["user_status"]=>
    string(1) "0"
    ["display_name"]=>
    string(13) "anotherposter"
    ["spam"]=>
    string(1) "0"
    ["deleted"]=>
    string(1) "0"
  }
  ["ID"]=>
  int(53767)
  ["caps"]=>
  array(2) {
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["cap_key"]=>
  string(15) "wp_capabilities"
  ["roles"]=>
  array(2) {
    [0]=>
    string(10) "subscriber"
    [1]=>
    string(15) "bbp_participant"
  }
  ["allcaps"]=>
  array(4) {
    ["read"]=>
    bool(true)
    ["level_0"]=>
    bool(true)
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["filter"]=>
  NULL
  ["site_id":"WP_User":private]=>
  int(1)
}

We have a 2 family used as a 1\.  I called Con-Ed to remove the meter we weren’t using and they just sent someone out to remove it and that took all of 3 minutes, no cost or paperwork.  The previous owner had already had the extra electric meter removed so I don’t know if that process is any different.