Hello, we are soon to embark on an almost-gut reno of a brownstone and trying to figure out overall budget/wishlist, etc.. to set everyone’s expectations properly (including our own) before we start bidding, etc. For anyone who has gone through a job like this, generally speaking, what % of your overall budget went to architect and to GC?

4668squarefeet

in Brownstoner Renovation 12 years and 3 months ago

4

Please log in, in order to post replies!

4 replies

rodriguezstudio | 12 years and 3 months ago

string(1) "1"
object(WP_User)#4857 (8) {
  ["data"]=>
  object(stdClass)#4895 (12) {
    ["ID"]=>
    string(5) "43316"
    ["user_login"]=>
    string(15) "rodriguezstudio"
    ["user_pass"]=>
    string(34) "$P$BYrCgHC3Dzm0IB5TxC4zTVAvs8i.dK."
    ["user_nicename"]=>
    string(15) "rodriguezstudio"
    ["user_email"]=>
    string(24) "info@rodriguezstudio.net"
    ["user_url"]=>
    string(57) "http://bstoner.wpengine.com/forums/users/rodriguezstudio/"
    ["user_registered"]=>
    string(19) "2010-01-21 22:24:49"
    ["user_activation_key"]=>
    string(0) ""
    ["user_status"]=>
    string(1) "0"
    ["display_name"]=>
    string(15) "rodriguezstudio"
    ["spam"]=>
    string(1) "0"
    ["deleted"]=>
    string(1) "0"
  }
  ["ID"]=>
  int(43316)
  ["caps"]=>
  array(2) {
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["cap_key"]=>
  string(15) "wp_capabilities"
  ["roles"]=>
  array(2) {
    [0]=>
    string(10) "subscriber"
    [1]=>
    string(15) "bbp_participant"
  }
  ["allcaps"]=>
  array(4) {
    ["read"]=>
    bool(true)
    ["level_0"]=>
    bool(true)
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["filter"]=>
  NULL
  ["site_id":"WP_User":private]=>
  int(1)
}

We do most of our work (super hands on most of it) for a fixed fee (when you have done this long enough, you should have a good idea of what it takes in terms of staff time). % of construction (in my opinion and experience) is too likely to end up in conflict. However, just as a reference 15% of the construction cost is a good median number for many renovations (bigger is usually less smaller is usually more, the broader range is probably 10-25%).  As for the gc/construction, it really depends on the scope, but it is useful to assign a $ per square foot number.  I would say $200 psf is a decent number to work with- but it really depends on a lot of things and the overall scope.  I find that the best way to get a handle on costs is to walk the site with a contractor like 7andfive said- but it is important to have a decently concise idea of what you want/scope. hope this helps.

backeast | 12 years and 3 months ago

string(1) "1"
object(WP_User)#4856 (8) {
  ["data"]=>
  object(stdClass)#4855 (12) {
    ["ID"]=>
    string(5) "24559"
    ["user_login"]=>
    string(8) "backeast"
    ["user_pass"]=>
    string(34) "$P$Bp/QTxR/ZCbFX9sASGsi2ss2uf3xJI/"
    ["user_nicename"]=>
    string(8) "backeast"
    ["user_email"]=>
    string(19) "nsunshine@gmail.com"
    ["user_url"]=>
    string(23) "/forums/users/novice44/"
    ["user_registered"]=>
    string(19) "2017-08-10 14:06:41"
    ["user_activation_key"]=>
    string(20) "JhjzxiiZcOX6AVRCQRaY"
    ["user_status"]=>
    string(1) "0"
    ["display_name"]=>
    string(8) "backeast"
    ["spam"]=>
    string(1) "0"
    ["deleted"]=>
    string(1) "0"
  }
  ["ID"]=>
  int(24559)
  ["caps"]=>
  array(2) {
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["cap_key"]=>
  string(15) "wp_capabilities"
  ["roles"]=>
  array(2) {
    [0]=>
    string(10) "subscriber"
    [1]=>
    string(15) "bbp_participant"
  }
  ["allcaps"]=>
  array(4) {
    ["read"]=>
    bool(true)
    ["level_0"]=>
    bool(true)
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["filter"]=>
  NULL
  ["site_id":"WP_User":private]=>
  int(1)
}

We are doing a gut renovation now, paying 16% for the architects who are doing a lot of coordination, and have been extremely hands-on throughout the process. I may be in the minority here on Brownstoner, but that’s the approach we needed, and we’ve been extremely happy we’re doing it this way. We are saving ourselves a lot of headaches, but that comes at a cost of course. So if you have the time, knowledge and wherewithal to do a lot of coordinating and managing the process yourself, a flat fee architect may be the way to go. But if you want a more hands-on architect you may have to do a percentage. Also if you are doing structural work and/or central air, engineering consultants may have to be involved, so consider theses costs as well. In our project (full gut, taking out a structural wall, central air), engineering consultants and expeditors are costing 3-5% of the total project costs. Good luck and hope that helps!

Putnamdenizen | 12 years and 3 months ago

string(1) "1"
object(WP_User)#4852 (8) {
  ["data"]=>
  object(stdClass)#4858 (12) {
    ["ID"]=>
    string(4) "1667"
    ["user_login"]=>
    string(13) "Putnamdenizen"
    ["user_pass"]=>
    string(63) "$wp$2y$10$A/uVhx.UarNPKJZsxpy.S.PxwQgglBNI40qIlo0JkqNQehUN9Kls2"
    ["user_nicename"]=>
    string(13) "putnamdenizen"
    ["user_email"]=>
    string(17) "JLStevens@mac.com"
    ["user_url"]=>
    string(35) "http:///forums/users/putnamdenizen/"
    ["user_registered"]=>
    string(19) "2017-08-10 14:12:34"
    ["user_activation_key"]=>
    string(0) ""
    ["user_status"]=>
    string(1) "0"
    ["display_name"]=>
    string(13) "Putnamdenizen"
    ["spam"]=>
    string(1) "0"
    ["deleted"]=>
    string(1) "0"
  }
  ["ID"]=>
  int(1667)
  ["caps"]=>
  array(2) {
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["cap_key"]=>
  string(15) "wp_capabilities"
  ["roles"]=>
  array(2) {
    [0]=>
    string(10) "subscriber"
    [1]=>
    string(15) "bbp_participant"
  }
  ["allcaps"]=>
  array(4) {
    ["read"]=>
    bool(true)
    ["level_0"]=>
    bool(true)
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["filter"]=>
  NULL
  ["site_id":"WP_User":private]=>
  int(1)
}

Huh.  I guess it depends on what you want from an architect.  From 7andfive’s description s/he really wanted someone just to draw up and file plans that s/he and his/her contractor had devised.  Most of the architects I spoke to wanted a percentage 15% and up.

7andfive | 12 years and 3 months ago

string(1) "1"
object(WP_User)#4857 (8) {
  ["data"]=>
  object(stdClass)#4859 (12) {
    ["ID"]=>
    string(5) "13745"
    ["user_login"]=>
    string(8) "7andfive"
    ["user_pass"]=>
    string(34) "$P$BfmTY02LvPyUqP37EI3U3JgBqGNMOl1"
    ["user_nicename"]=>
    string(8) "7andfive"
    ["user_email"]=>
    string(18) "7andfive@gmail.com"
    ["user_url"]=>
    string(23) "/forums/users/7andfive/"
    ["user_registered"]=>
    string(19) "2017-08-10 14:01:26"
    ["user_activation_key"]=>
    string(0) ""
    ["user_status"]=>
    string(1) "0"
    ["display_name"]=>
    string(8) "7andfive"
    ["spam"]=>
    string(1) "0"
    ["deleted"]=>
    string(1) "0"
  }
  ["ID"]=>
  int(13745)
  ["caps"]=>
  array(2) {
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["cap_key"]=>
  string(15) "wp_capabilities"
  ["roles"]=>
  array(2) {
    [0]=>
    string(10) "subscriber"
    [1]=>
    string(15) "bbp_participant"
  }
  ["allcaps"]=>
  array(4) {
    ["read"]=>
    bool(true)
    ["level_0"]=>
    bool(true)
    ["subscriber"]=>
    bool(true)
    ["bbp_participant"]=>
    bool(true)
  }
  ["filter"]=>
  NULL
  ["site_id":"WP_User":private]=>
  int(1)
}

I would find an architect that charges a flat fee- not a percentage of the budget. In my experience, I told the GC want I wanted (my wishlist) and he gave me an estimate. Then I worked back from there about what I really needed done now (like eletrical and plumbing, structural work) and what could wait (roof deck). Good luck!