Does anyone have experience interpreting what this means? (reasons for failure?) I don’t understand all of the short hand/acronyms 001 CELLAR NOT COMPLETE PROVIDE FIRE RATED CEILING AND FIRE STOPING 001 CELLAR NOT COMPLETE PROVIDE FRSC DOORS-BOILER, GAS MT ELECT RM’S 001 CELLAR 001 IMPROPERLY COMPLETED REMOVE CONTRACTOR DEBRIS 001 CELLAR NOT COMPLETE PROVIDE SD/CM 001 CELLAR NOT COMPLETE BOILER RM PROVIDE FIRE RATED WALLS AS PER PLANS 001 CELLAR NOT COMPLETE INSTALL RECLING AT REAR STEPS 001 CELLAR 001,002,003,004 NOT COMPLETE APT ENTRY DOORS AND FRAMES PROVIDE FPSC 001 FLOOR 002 004 NOT COMPLETE

sqhaexgkh
in About Brooklyn 11 years and 11 months ago
3
Please log in, in order to post replies!

jcarch | 11 years and 11 months ago
string(1) "1" object(WP_User)#5144 (8) { ["data"]=> object(stdClass)#5119 (12) { ["ID"]=> string(5) "23991" ["user_login"]=> string(6) "jcarch" ["user_pass"]=> string(34) "$P$BS0hz8fYZfWVNwJxAdb5D7GSB6JTfb." ["user_nicename"]=> string(6) "jcarch" ["user_email"]=> string(22) "jpc@jcarchitecture.com" ["user_url"]=> string(21) "/forums/users/jcarch/" ["user_registered"]=> string(19) "2017-08-10 14:06:39" ["user_activation_key"]=> string(0) "" ["user_status"]=> string(1) "0" ["display_name"]=> string(6) "jcarch" ["spam"]=> string(1) "0" ["deleted"]=> string(1) "0" } ["ID"]=> int(23991) ["caps"]=> array(2) { ["subscriber"]=> bool(true) ["bbp_participant"]=> bool(true) } ["cap_key"]=> string(15) "wp_capabilities" ["roles"]=> array(2) { [0]=> string(10) "subscriber" [1]=> string(15) "bbp_participant" } ["allcaps"]=> array(4) { ["read"]=> bool(true) ["level_0"]=> bool(true) ["subscriber"]=> bool(true) ["bbp_participant"]=> bool(true) } ["filter"]=> NULL ["site_id":"WP_User":private]=> int(1) }
It can go either way. DOB tends to constantly be discovering ways to make things take longer and longer. Be prepared to be patient. Good luck. jcarch ———————— James Cleary Architecture brownstoner.staging.wpengine.com/jamescleary

sqhaexgkh | 11 years and 11 months ago
string(1) "1" object(WP_User)#5143 (8) { ["data"]=> object(stdClass)#5142 (12) { ["ID"]=> string(6) "209440" ["user_login"]=> string(9) "sqhaexgkh" ["user_pass"]=> string(34) "$P$BqanjzfDtJsOFbbIWAS4h.3Y4MQE5b." ["user_nicename"]=> string(9) "sqhaexgkh" ["user_email"]=> string(24) "janellmills329@yahoo.com" ["user_url"]=> string(0) "" ["user_registered"]=> string(19) "2024-06-28 23:55:26" ["user_activation_key"]=> string(0) "" ["user_status"]=> string(1) "0" ["display_name"]=> string(9) "sqhaexgkh" ["spam"]=> string(1) "0" ["deleted"]=> string(1) "0" } ["ID"]=> int(209440) ["caps"]=> array(1) { ["bbp_participant"]=> bool(true) } ["cap_key"]=> string(15) "wp_capabilities" ["roles"]=> array(1) { [0]=> string(15) "bbp_participant" } ["allcaps"]=> array(1) { ["bbp_participant"]=> bool(true) } ["filter"]=> NULL ["site_id":"WP_User":private]=> int(1) }
Thanks Jcarch, once these tasks are completed will the building pass or is there a chance that the inspector will find more violations during the follow-up inspection?

jcarch | 11 years and 11 months ago
string(1) "1" object(WP_User)#5139 (8) { ["data"]=> object(stdClass)#5145 (12) { ["ID"]=> string(5) "23991" ["user_login"]=> string(6) "jcarch" ["user_pass"]=> string(34) "$P$BS0hz8fYZfWVNwJxAdb5D7GSB6JTfb." ["user_nicename"]=> string(6) "jcarch" ["user_email"]=> string(22) "jpc@jcarchitecture.com" ["user_url"]=> string(21) "/forums/users/jcarch/" ["user_registered"]=> string(19) "2017-08-10 14:06:39" ["user_activation_key"]=> string(0) "" ["user_status"]=> string(1) "0" ["display_name"]=> string(6) "jcarch" ["spam"]=> string(1) "0" ["deleted"]=> string(1) "0" } ["ID"]=> int(23991) ["caps"]=> array(2) { ["subscriber"]=> bool(true) ["bbp_participant"]=> bool(true) } ["cap_key"]=> string(15) "wp_capabilities" ["roles"]=> array(2) { [0]=> string(10) "subscriber" [1]=> string(15) "bbp_participant" } ["allcaps"]=> array(4) { ["read"]=> bool(true) ["level_0"]=> bool(true) ["subscriber"]=> bool(true) ["bbp_participant"]=> bool(true) } ["filter"]=> NULL ["site_id":"WP_User":private]=> int(1) }
FRSC (or FPSC) means fire proof self closing door. Your DOB approved plans should have a note saying something like “36” wide 3/4 hour rated FPSC door”. Keep in mind that for the rating, that the door and the frame together get the fire rating, and that there should be a metal tag – usually on the hinge side door jamb, stating what the rating is. Looks like you need the right doors in the cellar boiler room, gas meter and electrical meter rooms/closets, and at the apartment doors at all floors. SD/CM is smoke detector/carbon monoxide detector. This will likely have to be hardwired, rather than battery powered, to meet code/inspection. I’m not sure what RECLING is…I’m guessing this is a typo, and the inspector meant “railing”. jcarch ———————— James Cleary Architecture brownstoner.staging.wpengine.com/jamescleary