Pipe Sizing
I need to replaced galvanized water supply lines in my 5 story building.
Should I go with 1″ or 1 1/4″. I currently have 3/4″ on the cold side and 1″ on the hot.
I need to replaced galvanized water supply lines in my 5 story building.
Should I go with 1″ or 1 1/4″. I currently have 3/4″ on the cold side and 1″ on the hot.