Signs of Classon Avenue’s big makeover have appeared! No heavy-duty work yet, just some new street markings for now. Soon to come to the avenue through Crown Heights, Clinton Hill, and Bed Stuy: parking-lane lines on both sides of the street (pictured); a single, 11-foot-wide center travel lane in low-traffic areas; two 10-foot-wide market travel lanes in busier areas; new street signal timing; and a full repaving. Check out the entire proposal from DOT here [PDF]. Great news, as this street is in dire need of some TLC.
Classon Avenue Redesign Coming This Month [Brownstoner]


What's Your Take? Leave a Comment