Development Watch: The Edge

the-edge-williamsburg-0108.jpg
We haven’t checked in with The Edge development on the Williamsburg waterfront since last April because, well, there really hasn’t been that much to report. Things are starting to heat up, however. The foundation work for the first phase of the project, which will include 575 market rate and 350 affordable units, is underway; a second phase could include another 500 to 600 apartments. Interestingly, Greenbuildings NYC reports that the developer, Douglaston Development, is shooting for a Silver LEED certification, which is extra sweet considering that part of the project includes a brownfield remediation. As Curbed notes, the project’s website now includes the best rendering to date of the two high-rise and two mid-rise buildings along with the news that the sales office will be opening in March 2008. This will be an important bellwether for the market. Should be interesting to watch.
The Edge Gets Edgier: Finally Shows Buildings [Curbed] GMAP
Edge Stays on Silver Track, Seeks Retail Tenants [Greenbuildings NYC]
Development Watch: The Edge [Brownstoner]

the-edge-rendering-williamsburg-0108.jpg

By Brownstoner |